Input data schema

This section describes the input data structure, format, and units used in our suite of solutions. Our tools are designed to ensure flexibility, interoperability, and transparency, enabling users to integrate diverse datasets efficiently while maintaining high computational performance.

Category

Label

Message

Type

Configuration

baseMVA

Base MVA, default is 100 MVA

Float

Configuration

Currency

Currency of the cost

String

Configuration

Name

Name of the entity

String

Deposit

Name

Name of the entity

String

Deposit

Fuel

Select the from fuel of the deposit

ObjectID

Deposit

Capacity

The storage capacity - MWh

Float

Deposit

Charge Efficiency

The charging efficiency - %

Float

Deposit

Discharge Efficiency

The discharge efficiency - %

Float

Deposit

Parent

Select the parent to reach out to for default values

ObjectID

Deposit

CAPEX

The overnight capital expenses - Currency/MWh

Float

Deposit

Charge Fix

Fix charges in addition to the fixed OM - Currency/MWh/y

Float

Deposit

Charge Variable

Variable charges in addition to the variable OM - Currency/MWh

Float

Deposit

Comments

Add comment describing the modelling approach and sources used

String

Deposit

Construction

The construction time - Years

Integer

Deposit

Discount Rate

The discount rate of the asset, real terms, pretax - %

Float

Deposit

Discrete Expansion

TRUE: to force discrete expansion, FALSE: per default - Boolean

Bool

Deposit

Dual

The impact of an additional MW of capacity to system costs Curr/MW

Float

Deposit

Lifetime

The technical lifetime - Years

Integer

Deposit

Location

Coordinates of the fuel

String

Deposit

Max New Units

The maximum number of new units added per year - #/y

Integer

Deposit

Max Units

The maximum number of units available - #

Integer

Deposit

Min New Units

The minimum number of new units added per year - #/y

Integer

Deposit

Min Units

The minimum number of units available - #

Integer

Deposit

OM Fix

The fix OM expense - Currency/MWh/y

Float

Deposit

OM Var

The var OM expense - Currency/MWh

Float

Deposit

Rating

The rating of the unit (accounting for ressource availability and outages) - %

Float

Deposit

Stor Losses

The storage losses (boil-off) - %/day

Float

Deposit

Units

The number of units available (when known) - #

Integer

Deposit

New Units Increase

The maximum increase in the annual development of new units - #/y

Integer

Deposit

Start Time

Start time of candidate availability. Default to simulation start + construction time

DateTime

Emission

Name

Name of the entity

String

Emission

Comments

Add comment describing the modelling approach and sources used

String

Emission

Price

The emissions price paid by the plant operator - Currency/ton

Float

Execution

Name

Name of the entity

String

Execution

Configuration

Configuration selected for the execution

ObjectID

Execution

Probability

Select the Scenario considered in the Execution with the associated probability

Float

Execution

Discount Rate

The discount rate of the asset, real terms, pretax - %

Float

Execution

End Time

The ending time of the simulation horizon

DateTime

Execution

Max Iter

The maximum number of iterations - #

Integer

Execution

Optimize Expansion

TRUE: if the expansion is to be calculated, FALSE: if not - Boolean

Bool

Execution

Resolution

The resolution of each timeslice

String

Execution

Start Time

The starting time of the simulation horizon

DateTime

Execution

Step

The duration of each step

String

Execution

Time Max

The maximum time for the optimization - Seconds

Float

Execution

Tolerance

The tolerance considered - %

Float

Execution

Confidence

The confidence level considered - %

Float

Execution

Allow Surplus

TRUE: to allow demand surplus (increases computing time) - Boolean

Bool

Execution

Allow Unserved Energy

TRUE: to allow not served energy (increases computing time) - Boolean

Bool

Execution

Comments

Add comment describing the modelling approach and sources used

String

Execution

Expansion Plan

The file containing the Expansion Plan to consider or to be the starting point

String

Execution

Reactive

Whether reactive power should be considered - Boolean

Bool

Execution

Non Linear Hydro

TRUE: to model non linear hydropower

Bool

Execution

Reservoir Optimization

TRUE: detailed reservoir optimization

Bool

Execution

Round Cover

The coverage of the rounding algorithm applied (optional) use 0 for light and 1 for wide coverage (accelerates computation but may compromise solution quality) - %

Float

Execution

Round Strength

The strength of the rounding algorithm applied (optional) use 0 for light and 1 for strong rounding (accelerates computation but may compromise solution quality) - %

Float

Execution

Time Min

The minimum time for the optimization - Seconds

Float

Execution

Model Name

Select the model to be executed (Kairos, Ceres, Fides, Hermes)

String

Execution

Overlap

Select the overlap for execution steps

String

Execution

Investment Step

Resolution for allowing new investments and applying discount rate. Default to Month(12)

String

Execution

Batch Size

The size of the batch (default 1 year)

String

Execution

Importance Sampling

TRUE: to consider the Importance Sampling variance reduction method, FALSE: per default - Boolean

Bool

Execution

Latin Hypercube Sampling

TRUE: to consider the Lating Hypercube Sampling variance reduction method, FALSE: per default - Boolean

Bool

Execution

Min Iter

The minimum number of iterations, 30 per default - #

Integer

Execution

Sampling period

The sampling period to be considered. First and last years will be considered, the remaining ones will be sampled with a jump of ExeSam years - #

Integer

Execution

Typical days

Typical days to be considered in each step - #

Integer

Flowgate

Name

Name of the entity

String

Flowgate

Parent

Select the parent to reach out to for default values

ObjectID

Flowgate

Comments

Add comment describing the modelling approach and sources used

String

Flowgate

NTC FromTo

The Net Transfer Capacity (in the from-to direction) - MW

Float

Flowgate

NTC ToFrom

The Net Transfer Capacity (in the to-from direction) - MW

Float

Flowgate

Override

The override value taken by the flowgate - MW

Float

Fuel

Name

Name of the entity

String

Fuel

NSECost

The penalty for unserved demand on the current node - Currency/MW

Float

Fuel

Parent

Select the parent to reach out to for default values

ObjectID

Fuel

Comments

Add comment describing the modelling approach and sources used

String

Fuel

Emissions Factor

Emissions factor of the fuel - ton/net GJ

Float

Fuel

Location

Coordinates of the fuel

String

Fuel

Price

The fuel price paid by the plant operator - Currency/net GJ

Float

Fuel

Purchase

If the fuel can be purchased - TRUE / FALSE - Boolean

Bool

Fuel

Sell

If the fuel can be sold - TRUE / FALSE - Boolean

Bool

Fuel

Shifting Cost

The cost of load shifting - Currency/MWh

Float

Fuel

Shifting Period

The maximum delay of demand for load shifting - Hours

Float

Fuel

Demand

The fuel demand on the current node - MW

Float

Generator

Name

Name of the entity

String

Generator

Node

Select the Node to which the Generator is connected

ObjectID

Generator

Technology

Select the Technology of the Generator

ObjectID

Generator

Fuel

Select the Fuel used by the Generator

ObjectID

Generator

Parent

Select the parent to reach out to for default values

ObjectID

Generator

Group

Select the generator to group to this generator to

ObjectID

Generator

Reservoir

Reservoir of the hydroelectric power plant

ObjectID

Generator

Waterway

Waterway of the hydroelectric power plant

ObjectID

Generator

CAPEX

The overnight capital expenses - Currency/MW

Float

Generator

Charge Fix

Fix charges in addition to the fixed OM - Currency/MW/y

Float

Generator

Charge Variable

Variable charges in addition to the variable OM - Currency/MWh

Float

Generator

Comments

Add comment describing the modelling approach and sources used

String

Generator

Construction

The construction time - Years

Integer

Generator

Discount Rate

The discount rate of the asset, real terms, pretax - %

Float

Generator

Discrete Expansion

TRUE: to force discrete expansion, FALSE: per default - Boolean

Bool

Generator

Discrete Operation

TRUE: to force discrete operation (above the technical minimum), FALSE: per default - Boolean

Bool

Generator

Dual

The impact of an additional MW of capacity to system costs Curr/MW

Float

Generator

Dynamic Peak

Dynamically limits the peak contribution based on actual dispatch - Boolean

Bool

Generator

Max Qgen

The maximum generation capacity of reactive power

Float

Generator

Min Qgen

The minimum generation capacity of reactive power

Float

Generator

Heat Rate

The heat rate of each segment - [ net GJ/MWh ]

Float

Generator

Capacity

The gross generation capacity of each unit - MW

Float

Generator

Initial Status

Initial status - 1: online, 0: offline

Float

Generator

Initial Time

Time in the initial status - hours

Float

Generator

Lifetime

The technical lifetime - Years

Integer

Generator

Location

Coordinates of the generator

String

Generator

Max Neg Ramp

Maximum negative generation ramp - MW/min

Float

Generator

Max New Units

The maximum number of new units added per year - #/y

Integer

Generator

Initial Power

Initial power generation - MW

Float

Generator

Max Ramp

Maximum positive generation ramp - MW/min

Float

Generator

Max Units

The maximum number of units available - #

Integer

Generator

Min Downtime

Minimum time down - hours

Float

Generator

Min New Units

The minimum number of new units added per year - #/y

Integer

Generator

Min Units

The minimum number of units available - #

Integer

Generator

Min Uptime

Minimum time up - hours

Float

Generator

Max Power

The maximum power to be produced - MW

Float

Generator

New Units Increase

The maximum increase in the annual development of new units - #/y

Integer

Generator

OM Fix

The fix OM expense - Currency/MW/y

Float

Generator

OM Variable

The variable OM expense - Currency/MWh

Float

Generator

Must Run

The must run generation - MW

Float

Generator

Peak Contribution

The contribution of each generator to peak coverage - %

Float

Generator

Override

The generation override - MW

Float

Generator

Pumping Efficiency

Pumping efficiency

Float

Generator

Turbine Efficiency

Turbine efficiency

Float

Generator

Production Factor

Production factor of the hydroelectric power plant - MW/m3/s

Float

Generator

Power Reserves

Maximum provision of power reserves - MW

Float

Generator

Pumping Factor

Production factor of the hydroelectric power plant - MW/m3/s

Float

Generator

Ramp Down

The ramp-down rate - %/min

Float

Generator

Ramp Up

The ramp-up rate - %/min

Float

Generator

Rating

The rating of the unit (accounting for ressource availability and outages) - %

Float

Generator

RES Contribution

The annual output per MW that can be considered renewable - MWh/MW

Float

Generator

Segment Capacity

The generation capacity of each segment - [ % of max. capacity ]

Float

Generator

Startup Costs

The start-up cost (default or if hot) - Currency/MW

Float

Generator

Startup Costs (Cold)

The start-up cost if cold - Currency/MW

Float

Generator

Startup Costs (Warm)

The start-up cost if warm - Currency/MW

Float

Generator

Startup Fuel

The start-up fuel (default or if hot) - net GJ/MW

Float

Generator

Startup Fuel (Cold)

The start-up fuel if cold - net GJ/MW

Float

Generator

Startup Fuel (Warm)

The start-up fuel if warm - net GJ/MW

Float

Generator

Startup Time

Time to start-up the plant (default or if hot) - hours

Float

Generator

Startup Time (Cold)

Time to start-up the plant if cold - hours

Float

Generator

Startup Time (Warm)

Time to start-up the plant if warm - hours

Float

Generator

Tecnical Min

The technical minimum capacity of each unit - %

Float

Generator

Time to Cold

Time after shutdown to reach cold temperature - hours

Float

Generator

Time to Warm

Time after shutdown to reach warm temperature - hours

Float

Generator

Units

The number of units available (when known) - #

Integer

Generator

TTR

Time to repair (either constant or distribution function) - Hours

String

Generator

TBF

Time between failures (either constant or distribution function) - Hours

String

Generator

FOR

Forced outage rate - %

Float

Generator

SOR

Scheduled outage rate - %

Float

Generator

Forced Outages

The online/offline status due to forced outages - %

Float

Generator

Scheduled Outages

The online/offline status due to scheduled outages - %

Float

Generator

Scheduled Outages Discrete

TRUE: to apply discrate schedule outage rates, FALSE: o.t. - Boolean

Bool

Generator

Importance Sampling

TRUE: to apply importance sampling, FALSE: per default - Boolean

Bool

Generator

Pump Cap

The pumping capacity of each unit - MW

Float

Generator

Start Time

Start time of candidate availability. Default to simulation start + construction time

DateTime

Line

Name

Name of the entity

String

Line

From Node

Select the From Node of the Line

ObjectID

Line

To Node

Select the To Node of the Line

ObjectID

Line

From Voltage

Select the From Voltage of the Line

Float

Line

To Voltage

Select the To Voltage of the Line

Float

Line

Type

Type of the line (AC, DC, AC is default)

String

Line

Flowgate

Select the Flowgate of the Line

ObjectID

Line

Parent

Select the parent to reach out to for default values

ObjectID

Line

Tap Angle Cen

Center Tap Angle

Float

Line

CAPEX

The overnight capital expenses - kCurrency

Float

Line

Thermal Rating

The thermal rating - MW

Float

Line

Charge Variable

Variable charges in addition to the variable OM - Currency/MWh

Float

Line

Comments

Add comment describing the modelling approach and sources used

String

Line

Conductance

The charging conductance of the line/transformer

Float

Line

Construction

The construction time - Years

Integer

Line

Discount Rate

The discount rate of the asset, real terms, pretax - %

Float

Line

Discrete Expansion

TRUE: to force discrete expansion, FALSE: per default - Boolean

Bool

Line

Dual

The impact of an additional MW of capacity to system costs Curr/MW

Float

Line

Flowgate Coefficient

Enter the coeficient applied to the line´s flow to evaluate the flowgate - %

Float

Line

Limits

The approach to model the thermal limits of the line (0: no limit, 1: P and Q limits, 2: octogonal, 3: exact)- #

Integer

Line

Loss Segments

The number of segments used to estimate losses - #

Integer

Line

Max New Units

The maximum number of new units added per year - #/y

Integer

Line

Max Units

The maximum number of units available - #

Integer

Line

Min New Units

The minimum number of new units added per year - #/y

Integer

Line

Min Units

The minimum number of units available - #

Integer

Line

New Units Increase

The maximum increase in the annual development of new units - #/y

Integer

Line

OM Fix

The fix OM expense - kCurrency/y

Float

Line

Polyline

Coordinate of the points of the lines

String

Line

Rating

The rating of the unit (accounting for ressource availability and outages) - %

Float

Line

Reactance

The series impedance of the line

Float

Line

Resistance

The series resitance of the line

Float

Line

Susceptance

The charging susceptance of the line

Float

Line

TapAngleDiff

Angle difference per tap

Float

Line

Negative Taps

Number of downward Taps

Integer

Line

Positive Taps

Number of upward Taps

Integer

Line

TapVoltageDiff

Voltage Difference per tap

Float

Line

Units

The number of units available (when known) - #

Integer

Line

TTR

Time to repair (either constant or distribution function) - Hours

String

Line

TBF

Time between failures (either constant or distribution function) - Hours

String

Line

FOR

Forced outage rate - %

Float

Line

SOR

Scheduled outage rate - %

Float

Line

Forced Outages

The online/offline status due to forced outages - %

Float

Line

Scheduled Outages

The online/offline status due to scheduled outages - %

Float

Line

Importance Sampling

TRUE: to apply importance sampling, FALSE: per default - Boolean

Bool

Line

Flow Type

Type of the line flow (Decoupled, Coupled, Conic,Default is calc with the r/x ratio of the line)

String

Line

Charge Fix

Fix charges in addition to the fixed OM - Currency/MW/y

Float

Line

Lifetime

The technical lifetime - Years

Integer

Line

Start Time

Start time of candidate availability. Default to simulation start + construction time

DateTime

Market

Name

Name of the entity

String

Market

Node

Select the Node to which the Market is connected

ObjectID

Market

Parent

Select the parent to reach out to for default values

ObjectID

Market

Comments

Add comment describing the modelling approach and sources used

String

Market

Energy Rate

Energy Rate of the market - Currency/MWh

Float

Market

Buy Capacity

The max quantity available for purchases from that Market - MW

Float

Market

Units

The number of units available (when known) - #

Integer

Market

Initial Rate

Initial rate of the market

Float

Market

Annual Rate

Annual rate of the market

Float

Market

Sell Capacity

The max quantity available for sales to that Market - MW

Float

Market

Discrete Market

TRUE: Market will be used 0 or 100%. FALSE: Market utilization range from 0-100%

Bool

Market

RES Contribution

The annual output per MW that can be considered renewable - MWh/MW

Float

Market

Peak Contribution

The contribution of each market to peak coverage - %

Float

Market

Availability Rate

Availability rate of the market

Float

Market

Rating

The rating of the market (accounting for ressource availability and outages) - %

Float

Market

Max Units

The maximum number of units available - #

Integer

Market

Max New Units

The maximum number of new units added per year - #/y

Integer

Market

Period

Period in which settlement of banked energy takes place

String

Market

Compensation

Compensation policy of the market (None, Financial, InKind, InKindLower)

String

Market

Band Tariff

The tariff that applies to each time band of the market - Currency/MWh

Float

Market

Life Time

Lifetime of the market availability

Integer

Market

Start Time

Start time of candidate availability.

DateTime

Market

Min Units

The minimum number of units available - #

Integer

Node

Name

Name of the entity

String

Node

Region

Select the Region in which the Node is located

ObjectID

Node

Parent

Select the parent to reach out to for default values

ObjectID

Node

Comments

Add comment describing the modelling approach and sources used

String

Node

Location

Coordinate of the node

String

Node

Voltage

The nominal voltage level at the node - kV

Float

Node

Voltage Range

Voltage Range

Float

Pipe

Name

Name of the entity

String

Pipe

From Fuel

Select the from fuel of the pipeline

ObjectID

Pipe

To Fuel

Select the to fuel of the pipeline

ObjectID

Pipe

Capacity From-To

The from-to capacity - MW

Float

Pipe

Parent

Select the parent to reach out to for default values

ObjectID

Pipe

CAPEX

The overnight capital expenses - kCurrency

Float

Pipe

Charge Fix

Fix charges in addition to the fixed OM - kCurrency/y

Float

Pipe

Charge Variable

Variable charges in addition to the variable OM - Currency/MWh

Float

Pipe

Comments

Add comment describing the modelling approach and sources used

String

Pipe

Construction

The construction time - Years

Integer

Pipe

Discrete Expansion

TRUE: to force discrete expansion, FALSE: per default - Boolean

Bool

Pipe

Dual

The impact of an additional MW of capacity to system costs Curr/MW

Float

Pipe

Discount Rate

The discount rate of the asset, real terms, pretax - %

Float

Pipe

Losses

Losses of the pipe - %

Float

Pipe

Max New Units

The maximum number of new units added per year - #/y

Integer

Pipe

Min New Units

The minimum number of new units added per year - #/y

Integer

Pipe

Max Units

The maximum number of units available - #

Integer

Pipe

OM Fix

The fix OM expense - kCurrency/y

Float

Pipe

OM Var

The var OM expense - Currency/MWh

Float

Pipe

Polyline

Coordinate of the points of the lines

String

Pipe

Rating

The rating of the unit (accounting for ressource availability and outages) - %

Float

Pipe

Units

The number of units available (when known) - #

Integer

Pipe

New Units Increase

The maximum increase in the annual development of new units - #/y

Integer

Pipe

Capacity To-From

The to-from capacity - MW

Float

Pipe

Lifetime

The technical lifetime - Years

Integer

Pipe

Start Time

Start time of candidate availability. Default to simulation start + construction time

DateTime

Pipe

Min Units

The minimum number of units available - #

Integer

Point

Name

Name of the entity

String

PowerDemand

Name

Name of the entity

String

PowerDemand

Reactive Demand

The value of Reactive power demand - Mvar

Float

PowerDemand

Distribution

Float

PowerDemand

Parent

Select the parent to reach out to for default values

ObjectID

PowerDemand

Load Shifting Cost

The cost of load shifting - Currency/MWh

Float

PowerDemand

Load Shifting Period

The maximum delay of demand for load shifting - Hours

Float

PowerDemand

Comments

Add comment describing the modelling approach and sources used

String

PowerDemand

Not Supplied Energy Cost

The cost of not served energy - Currency/MWh

Float

PowerDemand

Peak Demand Contribution

The contribution of each demand to peak coverage - MW

Float

PowerDemand

Active Demand

The value of active power demand - MW

Float

PowerDemand

Reserves Cost

Reserves provision cost - Currency/MW/h

Float

PowerDemand

Power Reserves

Maximum provision of reserves - MW

Float

Region

Name

Name of the entity

String

Region

Parent

Select the parent to reach out to for default values

ObjectID

Region

Discount Rate

The discount rate of the asset, real terms, pretax - %

Float

Region

Domestic Coverage

The share of peak demand and of reserves that need to be supllied internally - %

Float

Region

Peak Dem. Penalty

The cost of not meeting the firm capacity needs - Currency/MW/year

Float

Region

Reserves Penalty

The cost of not provided reserves - Currency/MW/h

Float

Region

Comments

Add comment describing the modelling approach and sources used

String

Region

Renewables Penalty

The cost of not meeting the renewables share - Currency/MWh

Float

Region

Peak Demand

The peak demand of the region - MW

Float

Region

Reserves Duration

Minimum duration of the provision of reserves - mins

Float

Region

RES Target

The target renewable power generation - GWh/year

Float

Region

Res. Required

Reserves requirements - MW

Float

Region

Max Imports

Maximum imports for a region - MW

Float

Region

Max Exports

Maximum exports for a region - MW

Float

Reservoir

Name

Name of the entity

String

Reservoir

Parent

Select the parent to reach out to for default values

ObjectID

Reservoir

Spillage

Select the waterway for spillage

ObjectID

Reservoir

CAPEX

The overnight capital expenses - Currency/MW

Float

Reservoir

Charge Fix

Fix charges in addition to the fixed OM - kCurrency/y

Float

Reservoir

Comments

Add comment describing the modelling approach and sources used

String

Reservoir

Construction

The construction time - Years

Integer

Reservoir

Discrete Expansion

TRUE: to force discrete expansion, FALSE: per default - Boolean

Bool

Reservoir

Discount Rate

The discount rate of the asset, real terms, pretax - %

Float

Reservoir

Final level

The final level of the reservoir - hm3

Float

Reservoir

Inflows

The water inflows due to rain, snowmelt etc. - m3/s

Float

Reservoir

Initial level

The initial level of the reservoir - hm3

Float

Reservoir

Location

Coordinate of the Reservoir

String

Reservoir

Max New Units

The maximum number of new units added per year - #/y

Integer

Reservoir

Min New Units

The minimum number of new units added per year - #/y

Integer

Reservoir

Max Units

The maximum number of units available - #

Integer

Reservoir

OM Fix

The fix OM expense - Currency/MW/y

Float

Reservoir

Outflow

The water outflows due to irrigation, evaporation, filtration etc. - m3/s

Float

Reservoir

Penalty

The value of the penalty for not being able to fulfill the volume constraints - Currency/hm3

Float

Reservoir

Rating

The rating of the unit (accounting for ressource availability and outages) - %

Float

Reservoir

Units

The number of units available (when known) - #

Integer

Reservoir

Head

The head at the filling point - m

Float

Reservoir

Volume

The volume at the given filling point - hm3

Float

Reservoir

Maximum Volume

The maximum level of the reservoir - hm3

Float

Reservoir

Minimum Volume

The minimum level of the reservoir - hm3

Float

Reservoir

Lifetime

The technical lifetime - Years

Integer

Reservoir

Min Units

The minimum number of units available - #

Integer

Scenario

Name

Name of the entity

String

Scenario

Variant

Select the Variant considered in the Execution

ObjectID

Segment

Name

Name of the entity

String

Segment

Comments

Add comment describing the modelling approach and sources used

String

Storage

Name

Name of the entity

String

Storage

Node

Select the Node to which the Storage is connected

ObjectID

Storage

Technology

Select the Technology of the Storage

ObjectID

Storage

Charge Efficiency

The charging efficiency - %

Float

Storage

Discharge Efficiency

The discharge efficiency - %

Float

Storage

Storage Cap

The storage capacity - MWh

Float

Storage

Parent

Select the parent to reach out to for default values

ObjectID

Storage

Group

Select the storage to group to this storage to

ObjectID

Storage

CAPEX

The overnight capital expenses - Currency/MW

Float

Storage

Capacity

The gross generation capacity of each unit - MW

Float

Storage

Charge Variable

Variable charges in addition to the variable OM - Currency/MWh

Float

Storage

Comments

Add comment describing the modelling approach and sources used

String

Storage

Construction

The construction time - Years

Integer

Storage

Discount Rate

The discount rate of the asset, real terms, pretax - %

Float

Storage

Discrete Expansion

TRUE: to force discrete expansion, FALSE: per default - Boolean

Bool

Storage

Dual

The impact of an additional MW of capacity to system costs Curr/MW

Float

Storage

Dynamic Peak

Dynamically limits the peak contribution based on actual dispatch - Boolean

Bool

Storage

Location

Coordinates of the storage

String

Storage

Max New Units

The maximum number of new units added per year - #/y

Integer

Storage

Min New Units

The minimum number of new units added per year - #/y

Integer

Storage

Max Units

The maximum number of units available - #

Integer

Storage

New Units Increase

The maximum increase in the annual development of new units - #/y

Integer

Storage

Charge Fix

Fix charges in addition to the fixed OM - Currency/MW/y

Float

Storage

OM Variable

The variable OM expense - Currency/MWh

Float

Storage

Peak Contribution

The contribution of each storage to peak coverage - %

Float

Storage

OM Fix

The fix OM expense - Currency/MW/y

Float

Storage

Rating

The rating of the unit (accounting for ressource availability and outages) - %

Float

Storage

Units

The number of units available (when known) - #

Integer

Storage

TTR

Time to repair (either constant or distribution function) - Hours

String

Storage

TBF

Time between failures (either constant or distribution function) - Hours

String

Storage

FOR

Forced outage rate - %

Float

Storage

SOR

Scheduled outage rate - %

Float

Storage

Forced Outages

The online/offline status due to forced outages - %

Float

Storage

Scheduled Outages

The online/offline status due to scheduled outages - %

Float

Storage

Importance Sampling

TRUE: to apply importance sampling, FALSE: per default - Boolean

Bool

Storage

Power Reserves

Maximum provision of power reserves - MW

Float

Storage

Lifetime

The technical lifetime - Years

Integer

Storage

Start Time

Start time of candidate availability. Default to simulation start + construction time

DateTime

Storage

Min Units

The minimum number of units available - #

Integer

Synthesis

Name

Name of the entity

String

Synthesis

Fuel

Select the fuel of the fuel synthesis facility

ObjectID

Synthesis

Node

Select the node of the fuel synthesis facility

ObjectID

Synthesis

Efficiency

Losses of the transformation process - %

Float

Synthesis

Parent

Select the parent to reach out to for default values

ObjectID

Synthesis

CAPEX

The overnight capital expenses - Currency/MW

Float

Synthesis

Capacity

The synthesis capacity - MW

Float

Synthesis

Charge Variable

Variable charges in addition to the variable OM - Currency/MWh

Float

Synthesis

Comments

Add comment describing the modelling approach and sources used

String

Synthesis

Construction

The construction time - Years

Integer

Synthesis

Discrete Expansion

TRUE: to force discrete expansion, FALSE: per default - Boolean

Bool

Synthesis

Dual

The impact of an additional MW of capacity to system costs Curr/MW

Float

Synthesis

Discount Rate

The discount rate of the asset, real terms, pretax - %

Float

Synthesis

Location

Coordinates of the fuel

String

Synthesis

Max New Units

The maximum number of new units added per year - #/y

Integer

Synthesis

Min New Units

The minimum number of new units added per year - #/y

Integer

Synthesis

Max Units

The maximum number of units available - #

Integer

Synthesis

Charge Fix

Fix charges in addition to the fixed OM - Currency/MW/y

Float

Synthesis

OM Var

The var OM expense - Currency/MWh

Float

Synthesis

Rating

The rating of the unit (accounting for ressource availability and outages) - %

Float

Synthesis

Units

The number of units available (when known) - #

Integer

Synthesis

New Units Increase

The maximum increase in the annual development of new units - #/y

Integer

Synthesis

OM Fix

The fix OM expense - Currency/MW/y

Float

Synthesis

Lifetime

The technical lifetime - Years

Integer

Synthesis

Start Time

Start time of candidate availability. Default to simulation start + construction time

DateTime

Synthesis

Min Units

The minimum number of units available - #

Integer

Technology

Name

Name of the entity

String

Technology

Comments

Add comment describing the modelling approach and sources used

String

Technology

Max New Units

The maximum number of new units added per year - #/y

Integer

Technology

Min New Units

The minimum number of new units added per year - #/y

Integer

Technology

Max Units

The maximum number of units available - #

Integer

Technology

New Units Increase

The maximum increase in the annual development of new units - #/y

Integer

Technology

Min Units

The minimum number of units available - #

Integer

Variant

Name

Name of the entity

String

Variant

Comments

Add comment describing the modelling approach and sources used

String

Waterway

Name

Name of the waterway

String

Waterway

Parent

Parent of the waterway

ObjectID

Waterway

Reservoir

Reservoir where the waterway ends

ObjectID

Waterway

Comments

Comments of the waterway

String

Waterway

Max Flow

Maximum flow of the waterway - m3/s

Float

Waterway

Min Flow

Minimum flow of the waterway - m3/s

Float

Waterway

Inflows

The water inflows due to rain, snowmelt etc. - m3/s

Float

Waterway

Outflow

The water outflows due to irrigation, evaporation, filtration etc. - m3/s

Float

Waterway

Polyline

Coordinates of the waterway path

String

Waterway

Penalty

Penalty of the waterway

Float